SkyGlide Ltd — home Client Area
Energy-from-waste facility under construction, filmed by SkyGlide

Case study — Energy from Waste

A decade inside the UK’s
energy-from-waste build-out

Eleven major energy construction programmes. Multi-year cameras, live portals, drone progress films and milestone edits — from first groundworks to first waste, and now into the UK’s first carbon-capture programme.

11Nationally significant energy programmes filmed
Multi-yearContinuous capture per site
LivePortal access for every project team
UK firstCarbon capture at Protos — on our cameras

The portfolio

The UK’s energy build-out, on camera

SkyGlide has filmed the construction of the UK’s new generation of energy-from-waste facilities and fast-response power stations — long-duration timelapse, aerial progress filming and delivery films across the country’s most significant plants.

Slough Multifuel ERFKanadevia Inova · Berkshire
Riverside 2Cory Group · London
Newhurst ERFEncyclis & Biffa · Leicestershire
Protos ERFEncyclis · Cheshire
Rookery South ERFCovanta · Bedfordshire
Hirwaun PowerOCGT · Drax · South Wales
VPI ImminghamOCGT · VPI · Lincolnshire
Progress PowerOCGT · Drax · Eye, Suffolk
Millbrook PowerOCGT · Drax · Bedfordshire
Walsall ERFEncyclis · West Midlands
Protos Carbon CaptureUK first — with Encyclis & Kanadevia Inova

And the next era has already started. The Protos carbon-capture programme — delivered by Encyclis with Kanadevia Inova — is the first of its kind in the UK, and SkyGlide’s cameras and crews are on it from day one. When the sector writes its history, the footage will be ours.

SkyGlide crew and Encyclis site team on the Protos Carbon Capture programme

On site — Protos Carbon Capture

SkyGlide crew embedded alongside Encyclis, watching the UK’s first carbon-capture build take shape.

What we deliver

Built for programmes measured in years

01

Towers & live portal

Self-powered Rapid Tower systems capturing continuously for the full programme — with live feeds and the complete archive in a private portal the whole project team can use, on any device.

02

Aerial & ground progress filming

CAA-authorised drone crews flying regular progress sorties over live sites — CSCS-carded, RAMS for every visit, insured to £10m, cleared for the tightest site protocols.

03

Films, stills & milestones

Edited delivery films, milestone edits and stills for boards, intranets and public communications — shot in 6K/8K and turned around in days, not months.

SkyGlide crew rigging camera equipment on an active construction site

CSCS-carded, every visit

Rigging alongside the main contractor’s own site team — cleared, briefed and trusted on live construction sites.

Thank you very much for the excellent work and collaboration over the past two-plus years.

Dimitrios — Project Coordinator, Metlen Energy & Metals

The drone photos look great, and the angle of coverage for the relocated timelapse camera is excellent — we can see the whole site.

Harpreet — Encyclis
Metlen Energy and Metals site engineer inside an energy facility, filmed by SkyGlide

Inside the process — with Metlen Energy & Metals

Access most cameras never get — the working heart of the plant, not just the site hoarding.

Your programme

Planning an ERF or CCS build?

Tell us the site and the dates — you’ll have a fixed quote the same working day.

Book a free site survey